Survey Fees

SURVEY FEES AS PER SECOND SCHEDULE TO REGULATION 7(2)
OF THE SURVEYORS (REGISTRATION AND ADMINISTRATION) REGULATIONS 1989
AS AMENDED BY G.N. NO.S14 OF 1996

Survey fees for title surveys are classified in accordance with the Categories of land use such as agriculture, residential, commercial, industrial and other purposes. Licensed Surveyors shall carry out the survey as per the instructions issued by the District Surveyor under the Registered Survey Paper (R.S.P) and submit the R.S.P. with certified plan/s and relevant documents to the District Surveyors.

The fees listed in the following Tables are applicable to surveys for new alienation, subdivision and resurveys.


TABLE 1

FOR SURVEY OF AGRICULTURAL LAND UNDER PART II AND PART IV OF THE
LAND ORDINANCE CAP. 68

The survey fees for agricultural land under Part II and Part IV of the Land Ordinance Cap. 68 and T.O.L. shall consist of the following charges:-

 

 

RM

1)

Basic charge per job

 

950.00

2)

Charge for each lot as per rates shown below:


 

Size of Lot

Charge per lot

 

 

RM

a)

1 hectare or part thereof

350.00

b)

For each additional hectare of a lot upto 5 hectares

300.00

c)

5 hectares

1,500.00

d)

For each additional hectare of a lot upto 25 hectares

150.00

e)

25 hectares

4,500.00

f)

For each additional hectare of a lot upto 50 hectares

125.00

g)

50 hectares

7,625.00

h)

For each additional hectare of a lot upto 100 hectares

75.00

i)

100 hectares

11,375.00

j)

For each additional hectare of a lot upto 500 hectares

35.00

k)

500 hectares

25,375.00

l)

For each additional hectare of a lot upto 1,000 hectares

25.00

m)

1,000 hectares

37,875.00

n)

For each additional hectare of a lot above 1,000 hectares

20.00

In calculating the above charges any additional part of an hectare will be reckoned as one hectare.

 

 

RM

3)

Charge for lines for azimuth, connections, controls and sections of boundary lines and

For developed land where buildings, walls, fences hedges, etc have been put along any of the boundaries

 

2.00 per metre

 

2.50 per metre

4)

Charge for the reestablishment of old boundary marks found missing or out of position for each mark refixed or replaced

 

150.00 per each mark

5)

Disbursements, where applicable, as provided in Table 11.

Back

Copyright 2004 © Sabah Surveyors Board     Last updated: January 25, 2006 .  Optimized for 800x600 screen resolution.