SURVEY FEES AS PER SECOND SCHEDULE TO REGULATION 7(2)
OF THE SURVEYORS (REGISTRATION AND ADMINISTRATION) REGULATIONS 1989
AS AMENDED BY G.N. NO.S14 OF 1996
Survey fees for title surveys are classified in accordance with the Categories of land use such as agriculture, residential, commercial, industrial and other purposes. Licensed Surveyors shall carry out the survey as per the instructions issued by the District Surveyor under the Registered Survey Paper (R.S.P) and submit the R.S.P. with certified plan/s and relevant documents to the District Surveyors.
The fees listed in the following Tables are applicable to surveys for new alienation, subdivision and resurveys.
TABLE 13 SURVEY OF LAND FOR MINING
The survey fees for the survey of land for the purpose of mining lease shall be as follows:-
|
|
RM |
1) |
Basic charge |
950.00 |
2) |
Charge for each lot as per rates shown below:- |
|
SIZE OF LOT
|
CHARGE
PER LOT
|
|
|
RM |
a) |
For 1 hectare or part thereof |
3,000.00 |
b) |
For each additional hectare of a lot up to 5 hectares |
750.00 |
c) |
For 5 hectares |
6,000.00 |
d) |
For each additional hectare of a lot above 5 hectares upto 10 hectares |
600.00 |
e) |
For 10 hectares |
9,000.00 |
f) |
For each additional hectare of a lot above 10 hectares upto 25 hectares |
195.00 |
g) |
For 25 hectares |
11,925.00 |
h) |
For each additional hectare of a lot above 25 hectares upto 50 hectares |
165.00 |
i) |
For 50 hectares |
16,060.00 |
j) |
For each additional hectare of a lot above 50 hectares upto 100 hectares |
100.00 |
k) |
For 100 hectares |
21,050.00 |
l) |
For each additional hectare of a lot above 100 hectares upto 500 hectares |
50.00 |
m) |
For 500 hectares |
41,050.00 |
n) |
For each additional hectare of a lot above 500 hectares upto 1,000 hectares |
35.00 |
o) |
For 1,000 hectares |
58,550.00 |
p) |
For each additional hectare of a lot above 1,000 hectares |
25.00 |
In calculating the above charges any additional part an hectare will be reckoned as one hectare.
|
|
RM |
3(a) |
Charge for lines for azimuth, connections and controls and also for surveyed boundary lines |
2.00 per metre |
(b) |
Charge for developed land where buildings, walls, fences, hedges, etc have been put along any of the boundaries |
2.50 per metre |
4) |
Charge for the reestablishment of old boundary marks found missing or out of position for each mark refixed or replaced |
150.00 per mark |
5) |
Disbursements where applicable, are as provided in Table 11. |
|